Technology that respects the architecture.

The best technology decisions are usually made before they are visible on site. Early coordination helps protect the architecture, reduce late changes and give the client a cleaner final experience.

Design stage

We contribute to the design, not just the installation.

We can work with architects and interior designers from concept stage onwards — advising on control positions, keypad aesthetics, speaker locations, equipment room sizing and infrastructure requirements. Our documentation is compatible with standard architectural drawing packages.

Specification

Clear specification documents for your project file.

We produce a full written specification for every installation, covering equipment schedules, network architecture, cabling requirements, mounting positions and programming logic. This documentation supports the wider project team and provides a record for the client after completion.

First fix

We coordinate with other trades at first-fix stage.

Our first-fix involvement covers cabling routes, back-box positions, conduit requirements and equipment room layout. We attend site at the appropriate stages and provide documentation for the electrician and other trades to work from. Early involvement is where the most value is created.

Aesthetics

Controls that complement the interior design.

We work with clients and designers to select control hardware that fits the interior. Architectural keypads, flush-mounted panels and discreet sensors are available in finishes that complement rather than interrupt the design. Technology should disappear into the fabric of the space.

Developer projects

Integration from plot-level planning.

For residential developers, we can advise on infrastructure requirements at planning and specification stage — ensuring new homes are designed to support smart home integration from the ground up, without retrofitting cost later. We are available to discuss developer enquiries separately.

Handover

Clean, documented handover to the end client.

Our handover package includes full system documentation, user guides and a walkthrough with the occupier. For developer projects, we can produce documentation in a format suitable for inclusion in the property handover file. We remain available after handover for any follow-up questions.

What to consider
at design stage.

Equipment room or rack space — typically 1–2 standard rack units per system
Conduit routes from equipment room to every room
Lighting circuit design — number of circuits per room and dimmer positions
In-ceiling speaker positions and back-box requirements
Access point positions and PoE switch provision
Gate and access control infrastructure at boundary
Camera positions and cable routes

What we
provide to you.

Written system specification compatible with project documentation
Equipment schedule with dimensions and power requirements
Network architecture drawing
First-fix cabling schedule for electrician
Control position drawings for interior design coordination
Site attendance at agreed programme stages
Handover documentation package for client file

Working on a project
we should know about?

Professional enquiries are welcome. We are happy to discuss a project at any stage, including early design and feasibility.